Quantification of water resources uncertainties in the Luvuvhu sub-basin of the Limpopo river basin

Publication date: Available online 9 February 2018 Source:Physics and Chemistry of the Earth, Parts A/B/C Author(s): N. Oosthuizen, D. Hughes, E. Kapangaziwiri, J. Mwenge Kahinda, V. Mvandaba In the absence of historical observed data, models are generally used to describe the different hydrological processes and generate data and information that will inform management and policy decision making. Ideally, any hydrological model should be based on a sound conceptual understanding of the processes in the basin and be backed by quantitative information for the parameterization of the model. However, these data are often inadequate in many sub-basins, necessitating the incorporation of the uncertainty related to the estimation process. This paper reports on the impact of the uncertainty related to the parameterization of the Pitman monthly model and water use data on the estimates of the water resources of the Luvuvhu, a sub-basin of the Limpopo river basin. The study reviews existing information sources associated with the quantification of water balance components and gives an update of water resources of the sub-basin. The flows generated by the model at the outlet of the basin were between 44.03 Mm3 and 45.48 Mm3 per month when incorporating +\-20% uncertainty to the main physical runoff generating parameters. The total predictive uncertainty of the model increased when water use data such as small farm and large reservoirs and irrigation were included. The dam ca...
Source: Physics and Chemistry of the Earth, Parts ABC - Category: Science Source Type: research